Solid Waste Thermal Neutralization Facility Project

Our company Özgün İnşaat has undertaken the floor leveling, water insulation and reinforced concrete works of the Solid Waste Thermal Neutralization Facility project with an annual capacity of 700,000 tons, which is located in the Bogorodsky district of Moscow city of Russia and plays a critical role in the solution of the growing garbage problem of Moscow.

The project covers 9.601 m² of water sealing, manufacturing of 52,022 m³ reinforced concrete and concrete walls without slab which should be done over 60-meter elevation. Within the scope of the project, 20 indirect and 400 direct personnel are employed.

Location RUSSIA
Client Rostec
Project Scope
  • 9.601 m² water sealing
  • 52,022 m³ reinforced concrete manufacturing
  • Manufacturing of concrete walls without slab which should be done over 60-meter elevation